11. 

The two classifications of inputs are

A. energies and maintenance
B. maintenance and waste
C. maintenance and signal
D. products and waste
E. None of the above

12. 

Documentation is prepared

A. at every stage
B. at system design
C. at system analysis
D. at system development
E. None of the above

13. 

System Implementation Phase entails

A. System check outs
B. Pilot run
C. Parallel runs
D. All of the above
E. None of the above

14. 

Which of the following is not true of the conversion phase of the development life cycle?

A. the user and systems personnel must work closely together.
B. steps must be taken to phase out the old system
C. documentation should be emphasized
D. the non machine components of the system should be considered
E. None of the above

15. 

Managers who are potential users of the MIS

A. select the optimum equipment configurations
B. evaluate alternate equipment configurations
C. describe information needs
D. All of the above
E. None of the above