1. 

A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :

A.

1
4

B.
1
10
C.
7
15
D.
8
15

2. 

A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

A.

9 1 days
5

B.
9 2 दिन
5
C.
9 3 दिन
5
D. 10

3. 

A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?

A. 12 days
B. 15 दिन
C. 16 दिन
D. 18 दिन

4. 

A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in:

A. 20 days
B.
22 1 दिन
2
C. 25 दिन
D. तीस दिन

5. 

A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?

A. Rs. 375
B.

400 रुपये

C.

600 रुपये

D.

800 रुपये